Bari
SOUTH-EST COAST, Bari
Permitted uses: Hospitality, Residential, Office
PROPERTY
MAIN SPECS
-
116
Land area (Ha)
-
6
Linear Coastal Park (Km)
-
86,2
Investment (Mln)
-
15
Distance from the airport (Km)
The redevelopment project of Bari’s south-eastern coastline (originated by a design competition) led to the drafting of the Urban Executive Plan (PUE) “Bari Costasud” and the allocation of €75 million through the Complementary National Plan (PNC) to the PNRR. This is going to implement the “Parco Bari Costasud”, a 6 km linear coastal park covering 116 hectares. The intervention area extends along this new urban waterfront and represents an investment opportunity integrated in the public works, currently under construction. The development framework envisages residential and tertiary functions, with the objective of expanding the city’s tourism and cultural offer within a sustainable perspective. The project forms part of a broader regeneration strategy for the municipality’s entire coastline (over 40 km), integrating ecological infrastructure with urban functions related to bathing and leisure. The public investment is designed to leverage private capital, while the PUE introduces more favourable planning conditions compared to the current Master Plan (PRG). The park is currently under construction and the PUE is nearing approval. The area benefits from strong multimodal accessibility — including railway connections, the national road network, the port and the airport — and has the potential to stimulate real estate enhancement initiatives in the regional capital of Apulia, a city experiencing renewed attractiveness within an outstanding landscape setting.
Seafront linear park shaping a next-generation mixed-use waterfront destination
the area
STRENGTHS
- Proximity to the sea and strong multimodal accessibility
- Flexible planning instruments
OPPORTUNITIES
- Scalable into the city’s primary urban park
- Strengthening tourism and cultural attractiveness
-
Property type
Hospitality, Residential, Office
-
Land area (Ha)
116
-
Year of construction
2021
-
Risk profile
Opportunistic